Dear Luma Residents, The pool deck has been scheduled for renovation and repairs along with refinishing of the Terrace and pool deck TEAK furniture. The pool deck will be...
11th St. WORK 5/22 – 5/27 Broadway to Grand: Street light and conduit work on the South side. MyFig construction team has been connected to Aven project team...
The 11th St. Gate is back in service and is operational at this time. The contractor still needs to return to make repairs to the curtain. We are aware...
Dear Residents, Subject: MyFig Update for Week of 5/14 MyFig 11th St. work schedule for this week: South side from Broadway to Olive – grading/paving and conduit work. During...
Dear Residents, With the recent vote passing in favor of the lobby remodel everyone has been asking – “When are we going to see these changes!” However, with most...
We have new updates regarding the gate and elevator #1. Gate Repair The contractor has informed us that they are expecting the parts to be in their possession this...