Manager’s Messages

Elleven’s Mandatory Reg. IV Testing – Sept. 13th 7:30am to 5:00pm

Attention Luma Residents,

Please note that we were just made aware of the below:

Elleven will be conducting the Annual Regulation #4 Fire and Life System testing

Tuesday, September 13, 2016

Hours: 7:30 am – 5:00 pm.

PLEASE NOTE THE FOLLOWING when utilizing the shared amenities:

  • GARAGE FIRE DOORS will immediately drop once testing begins. Please use caution while navigating the garage area. Do not drive and/or walk under the garage fire gates during this procedure as they are designed to close rapidly and to do so can cause serious bodily injury and/or death and severe damage to vehicles.
  • FIRE ALARMS AND STROBES will be activated throughout the terrace and parking garage, and announcements will be made over the PA system.

We apologize for the inconvenience and greatly appreciate your cooperation and thank you in advance for your patience and understanding.

Film Shoot Notice – Saturday, 3 Sept. 10PM

Location: Luma- exterior east/west alley

Dates: Film: Saturday, 3 September 2016 10PM to

3AM on Sunday, 4 September 2016

Company: Diamond Ice US Productions, Inc.“ICE” (Producer)

Producer will film driving scenes for a television pilot along Hope Street and into the Luma alley to the south of the building on Saturday, 3 September 2016 from 10pm to 3am on Sunday, 4 September 2016.

Producer will have camera placement on the west side of Hope Street near the east/west Luma alley only and film a car driving south Hope Street and into the alley.

Producer will have no extras on the sidewalk adjacent to the Luma nor lights in the alley behind the Luma.

Producer will have no set dressing on the sidewalk or in the alley.

Posted No Parking:

Both sides of Hope Street to from 11th Street to 12th Street.

Thank you for you cooperation,

Bartlett HOA and Wynn Locations

Alley Slurry Seal Notice – Aug. 31st – Sept. 3rd

Slurry Seal – Rear Drive and Alley

Attention All Luma Residents.

The alley adjacent the building, as well as the Evo Private Drive, are scheduled to have the second and final slurry coat applied starting August 31st, 2016. Work will be done in sections/zones. 11th St. parking gates will not be affected during this project but the alley will be affected. Please see details below. Traffic in certain areas will proceed in both directions in a single lane, so proceed with caution and be sure NOT to drive or step over fresh slurry.

Work is scheduled to take place by sections/zones from 7:00 AM, Wednesday August 31st through 5:00 PM, Saturday, September 3rd, 2016.

See attached map for a bird’s eye view of this project and how the sections/zones will be closed.

Please plan ahead by allowing extra time to get in and out of the parking structure, particularly during heavy traffic periods. Please note this schedule is subject to change. If necessary updates will be posted and eblasted to keep everyone apprised of any unforeseen changes.

Work will be performed in sections or zones. Although the alley gate will be open during portions of this project to exit, for simplicity reasons, and to avoid any costly mistakes, we strongly encourage all residents to use the 11th Street entry and exit gates for the duration of this project.

***Zone #1

Zone #1 will be closed from 7:00 AM Wednesday, August 31st – to 5:00 PM Thursday, September 1st.

This zone involves the rear alley from 12th St to the center of the Evo’s 2nd gate, as well as the entry side of their private drive.

Note: During this closure you will be able to exit the alley gate to get to Hope St. by making an immediate right onto the alley that runs parallel to Luma. Since the alley is narrow, and there maybe confusion regarding this temporary change from the norm, please proceed with caution.

***Zone #2

Zone #2 will be closed from 7am Thursday, September 1st – to 5pm Friday, September 2nd.

This zone is adjacent to Luma and directly in front of the alley gate.

Note: The alley gate will not operate during this portion of the project. You will only be able enter and exit using the 11th St. gate.

***Zone #3

Zone #3 will be closed from 7:00 AM Friday, September 2nd – to 5:00 PM Saturday, September 3rd.

This zone involves the area directly east of the unoccupied Gladstone Holler building and Evo’s private exit.

Note: If zone #2 dries as expected (temperature and humidity plays a big part) then you should be able to exit the alley gate after 5pm on Friday, September 1st to get to Hope St.. Please pay attention to any signage and directions given by work crews.

Again, we strongly suggest you plan to use the 11th St gate to enter and exit the parking structure from Wednesday, August 31st and Saturday, September 3rd.

We apologize for any inconvenience this may cause and thank you in advance for your cooperation while we work together to improve our communities.

“People St. Block Party” happening on Tuesday, August 23, 2016

Dear Luma Residents,

This is a friendly reminder about the “People St. Block Party” happening on Tuesday, August 23, 2016.

Date:
Tuesday, August 23, 2016

Time:
6:00 PM – 8:00 PM

Location:
Hope St. between 11th and 12th.
1111 S. Hope St. Los Angeles, CA. 90015

Save the date for an exciting celebration on Tuesday, August 23, 2016 from 6:00pm – 8:00pm on Hope St. in South Park. Join us as we recognize all of the community partners who work with the City to bring walkability and streetscape projects to life.

Activities will be centered around one of the People St Program’s recent accomplishments, the Hope St Parklet! Plus, featured bites and beverages available for purchase from The Briks.

Tickets will be available for cash purchase at the event, and can also be purchased online here.

About LADOT People St Program:
People St is a program of LADOT and the City of Los Angeles and your one stop shop for transforming LA’s city streets into active, accessible spaces for people. Projects initiated and driven by and for our communities can be brought to life by working through People St.
@LADOTPeopleSt

About American Planning Association (APA) LA:
The Los Angeles section of the American Planning Association is one of eight local sections of APA’s California Chapter, with 1,100 members in the Los Angeles area. APA Los Angeles helps its members share knowledge, advance their careers, and guide change in both the planning profession and our communities.

Thank you,

Request for Candidates

Dear Luma Homeowners,

By now you should have received in the mail a “Request for Candidates” letter and “ Request for Candidate Statement” form. The purpose of these documents is to find Luma members/homeowners interested in running for Luma’s Board. If you are one of these folks, please review and complete the Request for Candidate Statement and hand deliver it to the manager’s office; or email it to flanglois@actionlife.com ; or mail it to Luma Homeowners Association c/o Management, 1100 S. Hope St. Los Angeles, CA. 90015.

Please note, candidate statements must be submitted prior to 5:00pm, Wednesday, August 31, 2016 in order to be included on the ballot.

Thank you,

Location

1100 South Hope Street
Los Angeles, CA 90015
phone | (213) 742-0387

Management Team

General Manager
Francis Langlois, CCAM-HR | flanglois@actionlife.com

Manager Assistant
Taylor Jones | tjones@actionlife.com

Building Engineers
Steve Evans | sevans@actionlife.com

 

Management Company

Action Property Management
Regional Office
707 Wilshire Blvd., Suite 1475
Los Angeles, CA 90017
Office | 800-400-2284 EXT. 3608
(949) 450-0202

Corporate Office
2603 Main Street, Suite 500
Irvine, CA 92614
phone | (949) 450-0202
fax | (949) 450-0303