Dear Luma Residents, The actual physical work on the lobby improvement project will start this July 9th with an estimated completion date of December 15th. During this period of...
Dear Luma Residents, On Monday, June 25th, there will be a planned power outage affecting Luma, Elleven and Evo. The reason for the outage is to allow Elleven and...
The pool and pool deck are open at this time for usage. Unfortunately we are having problems with the spa pump seal. We expect the spa to be available...
Dear Residents, For some of you, spending time on Luma’s roof watching the fireworks around the city has become a tradition on July 4th. The event has grown popular...
MyFig 11th st work schedule through next week Today and Tomorrow Dig catch basin the within old roadway on east side of 11th and Hope. This Weekend Install electrical...
Dear Luma Residents, The pool deck has been scheduled for renovation and repairs along with refinishing of the Terrace and pool deck TEAK furniture. The pool deck will be...
11th St. WORK 5/22 – 5/27 Broadway to Grand: Street light and conduit work on the South side. MyFig construction team has been connected to Aven project team...
The 11th St. Gate is back in service and is operational at this time. The contractor still needs to return to make repairs to the curtain. We are aware...
Dear Residents, Subject: MyFig Update for Week of 5/14 MyFig 11th St. work schedule for this week: South side from Broadway to Olive – grading/paving and conduit work. During...